SIMATIC NET
S7-CPs for Industrial Ethernet
Manual Part B3L
CP 343-1 Lean
6GK7 343−1CX10−0XE0
as of hardware version 2, as of firmware version V2.0
for SIMATIC S7−300 / C7−300
Release 03/2007
C79000-G8976-C198-04
TP port:
2 x 8−pin RJ−45 socket
(beneath the front panel)
LED displays
X = Placeholder for hardware
version
SIMATIC NET
S7-CPs for Industrial Ethernet
Manual Part B3L
CP 343-1 Lean
6GK7 343−1CX10−0XE0 as of hardware version 2, as of firmware version V2.0 for SIMATIC S7−300 / C7−300
LED displays
TP port:
2 x 8−pin RJ−45 socket (beneath the front panel)
X = Placeholder for hardware version
Release 03/2007
C79000-G8976-C198-04
Notes on the Product
Notes on the Product
Product Names
This description contains information on the following product
SCP 343−1 Lean
Order number 6GK7 343−1CX10−0XE0
as of hardware version 2 and firmware version V2.0 for SIMATIC S7−300 / C7−300
Note
In this document, the term CP is used instead of the full product name.
Printed Product Information Supplied with the Product
Note
All the notices in the Product Information Bulletin shipped with this device must be adhered to.
Compatibility with the Previous Version
Note
Due to the increased functionality and restrictions, pay particular attention to the notes in Chapter 8 of this manual.
Address label: Unique MAC address preset for the CP
The CP ships with a factory-set MAC address.
To ensure a unique address assignment, we recommend that you use this factory set MAC address when configuring the module!
—
B3L−2 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
Release 03/2007 |
C79000-G8976-C198-04
Contents
Contents
Contents − Part A
Ethernet CPs − General information . . . . . . . . . . . . . . . . . . . see general part
Note
Please remember that Part A of the device manual also belongs to the description of the CP. Among other things, it contains explanations of the safety notices and general information that applies to all S7 CPs for Industrial Ethernet.
You will find the references in this Part B of the manual /…/ in the Appendix of the general Part A of the manual.
The following version of the manual Part A of the manual belongs to this version of Part B: Release 01/2007
You can download the general Part from the Internet:
http://www4.ad.siemens.de/view/cs/en/8777865
Contents − Part B3L
1 |
Properties / Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−5 |
|
2 |
Requirements for Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−8 |
|
3 |
Installation and Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−11 |
|
3.1 |
Procedure / Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−11 |
|
4 |
Displays . . |
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−14 |
5 |
Performance Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−17 |
|
5.1 |
Number of Possible Connections over Ethernet . . . . . . . . . . . . . . . . . . . |
B3L−17 |
|
5.2 |
Characteristic Data for S7 Communication . . . . . . . . . . . . . . . . . . . . . . . |
B3L−17 |
|
5.3 |
Characteristics of the SEND/RECEIVE Interface . . . . . . . . . . . . . . . . . |
B3L−18 |
|
5.4 |
Characteristic Data for PROFINET IO . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−19 |
|
6 |
Configuring and Programming the CP as a PROFINET IO Device . . . . . . . . . . |
B3L−20 |
|
6.1 |
Overview of the Preparatory Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−20 |
|
6.2 |
Principle of Data Exchange over PROFINET IO . . . . . . . . . . . . . . . . . . |
B3L−21 |
|
6.3 |
Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−22 |
|
6.3.1 |
Installing the CP and Specifying it as PROFINET IO Device . . . . . . . . |
B3L−22 |
|
6.3.2 |
Assigning the PROFINET IO Device to a PROFINET IO Controller . . |
B3L−24 |
|
6.4 |
Programming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−27 |
|
6.4.1 |
Interface for Programming on the PROFINET IO Device . . . . . . . . . . . |
B3L−27 |
|
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−3 |
||
Release 03/2007 |
C79000-G8976-C198-04
Contents
6.4.2 |
Initialization and Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−28 |
|
6.5 |
Example of Configuration and Programming . . . . . . . . . . . . . . . . . . . . . |
B3L−30 |
|
7 |
Web Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−33 |
|
7.1 |
Requirements and Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−33 |
|
7.2 |
Diagnostics Pages of the CP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−34 |
|
7.2.1 |
Start Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−35 |
|
7.2.2 |
Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−36 |
|
7.2.3 |
Rack Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−37 |
|
7.2.4 |
Diagnostic Buffer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−39 |
|
7.2.5 |
Industrial Ethernet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−40 |
|
7.2.6 |
PROFINET IO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−42 |
|
8 |
Compatibility with Predecessor Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−44 |
|
8.1 |
Extended Functionality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−44 |
|
8.2 |
Replacing Older Modules / Replacing Faulty Modules . . . . . . . . . . . . . |
B3L−44 |
|
9 |
Further Notes on Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−46 |
|
9.1 |
Memory Reset . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−46 |
|
9.2 |
Working with Fast Ethernet − automatic switchover . . . . . . . . . . . . . . . |
B3L−47 |
|
9.3 |
SNMP Agent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−49 |
9.4Possible Security Gaps on Standard IT Interfaces / Preventing
Illegal Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−50 |
|
9.5 |
Influence of MPI on Connections via Industrial Ethernet . . . . . . . . . . . |
B3L−50 |
9.6 |
Special Features of IP Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−51 |
9.7 |
Reserved Port Numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−51 |
9.8 |
Restart after Detection of a Duplicate IP Address in the Network . . . . |
B3L−52 |
9.9 |
Obtaining the IP Address over DHCP − CP STOP on Expiry of |
|
the Lease . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−52 |
|
9.10 |
Other information available about the CP . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−52 |
10 How to Load New Firmware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−53 |
|
11 Technical Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . |
B3L−54 |
B3L−4 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
Release 03/2007 |
C79000-G8976-C198-04
1 Properties / Services
1 Properties / Services
Application
The CP 343−1 Lean communications processor is designed for operation in a SIMATIC S7-300 programmable logic controller. It allows attachment of the S7−300 to Industrial Ethernet and supports PROFINET IO.
A 2-port switch with autocrossing, autonegotiation and autosensing was integrated in the CP for simple integration in a line or for attaching a further Ethernet device.
Services
The CP supports the following communication services:
SPROFINET IO device
Integration of the SIMATIC S7−300 programmable controller over the CP as intelligent PROFINET IO device.
SS7 communication and PG/OP communication
−PG functions (including routing)
−Operator control and monitoring functions (HMI)
−Server for data exchange on S7 connections configured at one end only without communication blocks on the S7-300 / C7-300 station
SS5 compatible communication with
−SEND/RECEIVE interface over ISO-on-TCP, TCP and UDP connections
−Multicast over UDP connection
The multicast mode is made possible by selecting a suitable IP address when configuring connections.
−FETCH/WRITE services (server; corresponding to S5 protocol) via ISO-on-TCP connections and TCP connections;
The addressing mode can be configured for FETCH/WRITE access as the S7 or S5 addressing mode.
−LOCK/UNLOCK with FETCH/WRITE services;
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−5 |
Release 03/2007 |
C79000-G8976-C198-04
1 Properties / Services
STime-of-day synchronization over Industrial Ethernet using the following configurable modes:
− SIMATIC mode
The CP receives MMS time frames and synchronizes its local time and the time of the CPU (accuracy approx. +/− 1 second);
or
−NTP mode (NTP: Network Time Protocol)
The CP sends time-of-day queries at regular intervals to an NTP server and synchronizes its local time of day and the time of the CPU (accuracy approx. +/− 1 second).
STime of day for the diagnostic buffer
If a time master exists (using the NTP or SIMATIC mode), the time for the CP-internal diagnostic buffer is synchronized over the LAN (accuracy approx. +/− 10 ms)
SAddressing using a factory-set MAC address
The CP can be reached over the default MAC address to allow an IP address to be assigned.
SSNMP Agent
The CP supports data queries over SNMP in version V1 (Simple Network Management Protocol) according to the MIB II and LLDP MIB standard.
You will find more information on MIB in the manual “Commissioning PC Stations” on the SIMATIC NET Manual Collection or at the following SIMATIC NET Internet page:
http://support.automation.siemens.com/WW/view/en/15177711
SIP configuration
You can configure how and with which method the CP is assigned the IP address, the subnet mask and the address of a default router.
It is also possible, as an alternative, to assign the connection configuration to the CP using STEP 7 or using a block interface in the user program (FB55: IP_CONFIG) (see /Part A/).
SWeb diagnostics
With the aid of Web diagnostics, you can read out the diagnostic data from a station connected over the CP to a PG/PC with an Internet browser.
B3L−6 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
Release 03/2007 |
C79000-G8976-C198-04
1 Properties / Services
Configuration
It is possible to download the configuration data to the CP over MPI or LAN/Industrial Ethernet. You require STEP 7 with NCM S7 for Industrial Ethernet (NCM IE) with the following version:
Table 1-1
Version STEP 7 / NCM IE |
Functions of the CP |
V5.2 or higher |
The range of functions of the CP 343−1 Lean (CX00) can be |
configured. |
|
V5.4 or higher |
Requirement for configuring the full functionality of the |
CP 343−1 Lean (CX10 with firmware V1.0) including PROFINET |
|
IO. |
|
V5.4 Service Pack 2 *) |
Requirement for configuring the full functionality of the |
CP 343−1 Lean (CX10 with firmware V2.0) including Web |
|
diagnostics. |
|
*) To use the CP with V5.4 Service Pack 1, you will need to install Hotfix 2, the corresponding hardware update and a block setup. You will find more information at the following Internet page: http://www4.ad.siemens.de/WW/news/en/24463868
Programming − Using Blocks
For some communications services, there are pre-programmed blocks (FCs/FBs) available as the interface in your STEP 7 user program.
You will find a detailed description of these blocks in the NCM S7 for Ethernet manuals.
Notice
We recommend that you always use the latest block versions for all module types.
You will find information on the latest block version and links to download the current blocks in our Customer Support area on the Internet:
http://www4.ad.siemens.de/WW/news/en/8797900
If you are using older block types, this recommendation only applies if you also have the latest firmware version.
You will find further information and Internet addresses in the Preface of the General Part of this manual.
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−7 |
Release 03/2007 |
C79000-G8976-C198-04
2 Requirements for Use
2 Requirements for Use
General Operation
The CP can be operated in the following device families:
SS7−300 stations with the CPU types
−Standard
−Compact
−Modular
SC7 control systems in C7 packaging system
The following tables show the devices with which the CP can be operated with this range of functions:
Notice
The tables list the CPUs and devices approved at the time of printing this manual. S7-300 CPUs or C7 or C7 control systems approved later and not listed in the table also support the range of functions described here.
Table 2-1 Use of the CP with S7−300
CPU |
Order Number |
|
CPU 312 |
6ES7 312−1AD10−0AB0 |
|
6ES7 312−1AE13−0AB0 |
||
CPU 312C |
6ES7 312−5BD01−0AB0 |
|
6ES7 312−5BE03−0AB0 |
||
CPU 312 IFM |
6ES7 312−5AC02−0AB0 |
|
CPU 313 |
6ES7 313−1AD03−0AB0 |
|
CPU 313C |
6ES7 313−5BE00−0AB0 |
|
6ES7 313−5BE01−0AB0 |
||
6ES7 313−5BF03−0AB0 |
||
CPU 313C−2 DP |
6ES7 313−6CE00−0AB0 |
|
6ES7 313−6CE01−0AB0 |
||
6ES7 313−6CF03−0AB0 |
||
CPU 313C−2 PtP |
6ES7 313−6BE00−0AB0 |
|
6ES7 313−6BE01−0AB0 |
||
6ES7 313−6BF03−0AB0 |
||
CPU 314 |
6ES7 314−6AE01−0AB0 |
|
6ES7 314−6AE02−0AB0 |
||
6ES7 314−6AE03−0AB0 |
||
6ES7 314−6AE04−0AB0 |
||
6ES7 314−1AF10−0AB0 |
||
6ES7 314−1AF11−0AB0 |
||
6ES7 314−1AG13−0AB0 |
||
B3L−8 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
|
Release 03/2007 |
C79000-G8976-C198-04
2 Requirements for Use
Table 2-1 Use of the CP with S7−300
CPU |
Order Number |
CPU 314 IFM |
6ES7 314−5AE03−0AB0 |
6ES7 314−5AE10−0AB0 |
|
CPU 314C−2 DP |
6ES7 314−6CF00−0AB0 |
6ES7 314−6CF02−0AB0 |
|
6ES7 314−6CG03−0AB0 |
|
CPU 314C−2 PtP |
6ES7 314−6BF00−0AB0 |
6ES7 314−6BF01−0AB0 |
|
6ES7 314−6BF02−0AB0 |
|
6ES7 314−6BG03−0AB0 |
|
CPU 315 |
6ES7 315−1AF03−0AB0 |
CPU 315−2 DP |
6ES7 315−2AF03−0AB0 |
6ES7 315−2AG10−0AB0 |
|
CPU 315−2 PN/DP |
6ES7 315−2EG10−0AB0 |
6ES7 315−2EH13−0AB0 |
|
CPU 315F−2 DP |
6ES7 315−6FF01−0AB0 |
CPU 315F−2 PN/DP |
6ES7 315−2FH10−0AB0 |
6ES7 315−2FH13−0AB0 |
|
CPU 316 |
6ES7 316−1AG00−0AB0 |
CPU 316−2 DP |
6ES7 316−2AG00−0AB0 |
CPU 317−2 DP |
6ES7 317−2AJ10−0AB0 |
CPU 317−2 PN/DP |
6ES7 317−2EJ10−0AB0 |
6ES7 317−2EK13−0AB0 |
|
CPU 317F−2 DP |
6ES7 317−6FF00−0AB0 |
6ES7 317−6FF03−0AB0 |
|
CPU 317F−2 PN/DP |
6ES7 317−2FJ10−0AB0 |
6ES7 317−2FK13−0AB0 |
|
CPU 318−2 |
6ES7 318−2AJ00−0AB0 |
CPU 319−3 PN/DP |
6ES7 318−3EL00−0AB0 |
CPU 614 |
6ES7 614−1AH03−0AB3 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−9 |
Release 03/2007 |
C79000-G8976-C198-04
2 Requirements for Use
Table 2-2 Use of the CP in C7 Control Systems
C7 |
Order Number |
C7−613 |
6ES7 613−1CA01−0AE03 |
6ES7 613−1CA02−0AE3 |
|
C7−633 DP |
6ES7 633−2BF02−0AE03 |
C7−635 Keys |
6ES7 635−2EC01−0AE3 |
6ES7 635−2EC02−0AE3 |
|
C7−635 Touch |
6ES7 635−2EB01−0AE03 |
6ES7 635−2EB02−0AE3 |
|
C7−636 Keys |
6ES7 636−2EC00−0AE03 |
6ES7 636−2EC00−0AE3 |
|
C7−636 Touch |
6ES7 636−2EB00−0AE3 |
B3L−10 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
Release 03/2007 |
C79000-G8976-C198-04
3 Installation and Commissioning
3 Installation and Commissioning
3.1Procedure / Steps
Step |
Explanation / Meaning |
|
1. |
Install the CP on the S7 standard rail. |
Slots 4 to 11 are permitted for the CP in racks 0 to 3 |
2. |
Establish the connection via the enclosed bus |
(connected by IM 360/361). |
connector to the backplane bus. |
Proceed as in the sections dealing with setup and |
|
wiring, described in detail in /1/. |
||
Note
The CP cannot be used in an extension rack that is connected via the IM 365! Reason: The required communication bus is not connected to the extension rack via the IM 365.
3. Connect the CP to the power supply.
Notes
Follow the steps as described in detail in /1/ when wiring between the power supply and the CPU.
SThe CPU, CP and IM (if one exists) must be connected to the same power supply.
SOnly wire up the S7-300 / C7-300 with the power switched off!
4. Attach the CP to Industrial Ethernet. |
||
5. The remaining steps in commissioning involve |
To download the configuration, you can connect |
|
downloading the configuration data. |
the PG as follows: |
|
S |
via MPI |
|
S |
via Industrial Ethernet |
|
For further details, refer to the general Part A of |
||
this manual: |
||
− addressing the first time (IP address |
||
assignment / node initialization); |
||
− downloading the defined configuration |
||
The PG/PC requires a LAN attachment, for |
||
example via a CP 1613 or CP 1411 and must have |
||
the necessary software (for example the S7-1613 |
||
package or SOFTNET IE). The TCP/IP protocol |
||
must be installed. The protocol used must then be |
||
applied to the S7ONLINE access point. |
||
6. User diagnostics for commissioning and to |
The following options are available: |
|
analyze problems. |
S |
The LED displays on the CP |
S Hardware diagnostics and troubleshooting with |
||
STEP 7 |
||
S Communication diagnostics with STEP 7 / NCM |
||
Diagnostics |
||
S Standard information using HW Config |
||
S |
Web diagnostics |
|
S If applicable, evaluation of the alarm block |
||
FB54 in the user program |
||
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−11 |
|
Release 03/2007 |
C79000-G8976-C198-04
3 Installation and Commissioning
Slider for setting |
Attachment to Industrial |
|
Ethernet: |
||
the chassis |
2 x 8-pin RJ-45 jack |
|
ground contact |
||
Figure 3-1 |
Connectors of a CP 343−1 Lean with the Front Panel Open |
Ground/Chassis Ground Concept
Notice
Please note the instructions regarding the grounding and chassis ground concept in the SIMATIC S7 installation guides; see “SIMATIC S7 Programmable Controller S7−300 − Installation and Hardware: Installation Manual” /1/.
Behind the hinged panel on the left of the device, you will see a slider with which you can connect or disconnect the chassis ground of the 24 V power supply with reference ground.
SSlider pushed in: chassis and reference ground connected (note: the slider must be felt to lock in place).
SSlider pulled out: No connection between chassis and reference ground. When shipped: Slider pushed in
Use a screwdriver to set the slider.
Note
An Ethernet cable can also be inserted and removed with the power supply on.
B3L−12 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
Release 03/2007 |
C79000-G8976-C198-04
3 Installation and Commissioning
Note
The hinged front panel must be kept closed during operation.
The module must be installed so that its upper and lower ventilation slits are not covered, allowing adequate ventilation.
Warning
!When used under hazardous conditions (zone 2), the devices must be installed in an enclosure.
To comply with ATEX100a (EN 60079−15), this enclosure must meet the requirements of at least IP54 in compliance with EN 60529.
WARNING − EXPLOSION HAZARD: DO NOT DISCONNECT EQUIPMENT WHEN A FLAMMABLE OR COMBUSTIBLE ATMOSPHERE IS PRESENT.
Warning
!The device is designed for operation with safety extra-low voltage (SELV). This means that only safety extra-low voltages (SELV) complying with IEC950/EN60950/ VDE0805 may be connected to the power supply terminals.
The power unit for supplying the device must comply with NEC Class 2 as described by the National Electrical Code(r) (ANSI/NFPA 70).
The power of all connected power units in total must correspond to a limited power source (LPS).
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−13 |
Release 03/2007 |
C79000-G8976-C198-04
4 Displays
4 Displays
The display on the front panel consists of 8 LEDs that indicate the operating mode and the communication status.
Front panel: |
SF |
|
BF |
||
DC5V |
||
RX/TX |
P1 |
|
RUN |
||
STOP |
P2 |
The LEDs have the following meaning:
S |
SF: |
Group error |
S |
BF: |
Bus fault PROFINET IO |
S |
DCV5: |
DC 5 V power supply via the backplane bus (green = OK) |
S |
RX/TX: |
Acyclic data exchange, for example Send/Receive |
(not relevant for PROFINET IO data) |
SRUN: RUN mode
SSTOP: STOP mode
SP1 / P2: Link status of Ethernet port 1 / port 2
B3L−14 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
Release 03/2007 |
C79000-G8976-C198-04
4 Displays
LEDs for displaying the mode
The different combinations of the LEDs on the front panel indicate the status:
SF(red) |
BF (red) |
RUN |
STOP |
CP Operating Mode |
|
(green) |
(yellow) |
||||
S Starting up after power “ON” |
|||||
or |
|||||
− |
S Stopped (STOP) with errors |
||||
In this state, the CPU or intelligent |
|||||
modules in the rack remain accessible |
|||||
using PG functions. |
|||||
Starting up (STOP->RUN) |
|||||
Running (RUN) |
|||||
Stopping (RUN->STOP) |
|||||
Stopped (STOP) |
|||||
In the STOP mode configuring and performing |
|||||
diagnostics on the CP remain possible. |
|||||
− |
− |
− |
S No LAN cable plugged in |
||
or |
|||||
S Duplicate IP address detected |
|||||
− |
− |
− |
The CP is configured as a PROFINET IO |
||
device; there is no data exchange with the |
|||||
PROFINET IO controller |
|||||
Module fault / system error |
|||||
Downloading firmware. |
|||||
Firmware was successfully downloaded. |
|||||
Firmware could not be downloaded. |
|||||
Legend: |
(colored) on |
off |
(colored) flashing |
“−” any |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−15 |
Release 03/2007 |
C79000-G8976-C198-04
4 Displays
LEDs for displaying the CP communication status
In addition to the LEDs that signal the CP state, the following LEDs provide information about the status of the CP interface to Industrial Ethernet.
Table 4-1
LED |
Display |
Meaning |
||||
RX/TX (green) |
The CP is sending/receiving over Industrial |
|||||
Ethernet |
||||||
Note: |
||||||
Sending / receiving over PROFINET IO is |
||||||
not signaled here. |
||||||
P1 / P2 |
Port has no connection to |
|||||
(green / yellow) |
Industrial Ethernet. |
|||||
green |
Existing connection over port to |
|||||
Industrial Ethernet (LINK status). |
||||||
green / |
LED flashes yellow (constant light green): |
|||||
yellow |
Port sending/receiving over |
|||||
Industrial Ethernet or PROFINET IO. |
||||||
Note: |
||||||
All received / sent frames are signaled for |
||||||
each specific port including those simply |
||||||
forwarded by the switch. |
||||||
P1 / P2 |
yellow |
Continuous data transfer at the port over |
||||
(green / yellow) |
Industrial Ethernet (for example |
|||||
PROFINET IO). |
||||||
Legend: |
(colored) on |
off |
(colored) flashing |
“−” any |
B3L−16 |
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
Release 03/2007 |
C79000-G8976-C198-04
5 Performance Data
5 Performance Data
5.1Number of Possible Connections over Ethernet
Table 5-1
Characteristic |
Explanation / Values |
Permitted number of simultaneous connections in |
12 maximum |
total over Industrial Ethernet |
|
Example of Maximum Load
You can operate:
4 S7 connections
4 ISO-on-TCP connections
2 TCP connections
2 UDP connections Also:
SFurther TCP connections for Web diagnostics
S1 PROFINET connection to a PROFINET IO controller
5.2Characteristic Data for S7 Communication
Table 5-2
Characteristic |
Explanation / Values |
||
Number of connections for S7 communication on |
4 maximum |
||
Industrial Ethernet for |
(the number depends on the CPU type being used. |
||
S Operator control and monitoring functions (HMI) |
Please refer to /1/ for the values for your CPU.) |
||
S S7 connections configured at one end |
|||
LAN interface − data record length per protocol unit |
|||
S |
sending |
240 bytes / PDU |
|
S |
receiving |
||
240 bytes / PDU |
|||
CP 343-1 Lean for Industrial Ethernet / Manual Part B3L |
B3L−17 |
Release 03/2007 |
C79000-G8976-C198-04
Loading…
Краткое содержание страницы № 1
SIMATIC NET
S7-CPs for Industrial Ethernet
Manual Part B3L
CP 343-1 Lean
6GK7 343 −1CX10 −0XE0 as of hardware version 2, as of firmware version V2.0
for SIMATIC S7 −300 / C7 −300
LED displays
TP port:
2 x 8 −pin RJ −45 socket
(beneath the front panel)
X = Placeholder for hardware
version
Release 03/2007
C79000-G8976-C198-04
Краткое содержание страницы № 2
Notes on the Product Notes on the Product Product Names This description contains information on the following product CP 343 −1 Lean Order number 6GK7 343 −1CX10 −0XE0 as of hardware version 2 and firmware version V2.0 for SIMATIC S7 −300 / C7 −300 Note In this document, the term CP is used instead of the full product name. Printed Product Information Supplied with the Product Note All the notices in the Product Information Bulletin shipped with this device must be adhered to. Compatibility w
Краткое содержание страницы № 3
Contents Contents Contents − Part A Ethernet CPs − General information . . . . . . . . . . . . . . . . . . . see general part Note Please remember that Part A of the device manual also belongs to the description of the CP. Among other things, it contains explanations of the safety notices and general information that applies to all S7 CPs for Industrial Ethernet. You will find the references in this Part B of the manual /…/ in the Appendix of the general Part A of the manual. The following ver
Краткое содержание страницы № 4
Contents 6.4.2 Initialization and Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L −28 6.5 Example of Configuration and Programming . . . . . . . . . . . . . . . . . . . . . B3L −30 7 Web Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−33 7.1 Requirements and Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L −33 7.2 Diagnostics Pages of the CP . .
Краткое содержание страницы № 5
1 Properties / Services 1 Properties / Services Application The CP 343 −1 Lean communications processor is designed for operation in a SIMATIC S7-300 programmable logic controller. It allows attachment of the S7 −300 to Industrial Ethernet and supports PROFINET IO. A 2-port switch with autocrossing, autonegotiation and autosensing was integrated in the CP for simple integration in a line or for attaching a further Ethernet device. Services The CP supports the following communication services:
Краткое содержание страницы № 6
1 Properties / Services Time-of-day synchronization over Industrial Ethernet using the following configurable modes: − SIMATIC mode The CP receives MMS time frames and synchronizes its local time and the time of the CPU (accuracy approx. +/ − 1 second); or − NTP mode (NTP: Network Time Protocol) The CP sends time-of-day queries at regular intervals to an NTP server and synchronizes its local time of day and the time of the CPU (accuracy approx. +/ − 1 second). Time of day for the diagnostic
Краткое содержание страницы № 7
1 Properties / Services Configuration It is possible to download the configuration data to the CP over MPI or LAN/Industrial Ethernet. You require STEP 7 with NCM S7 for Industrial Ethernet (NCM IE) with the following version: Table 1-1 Version STEP 7 / NCM IE Functions of the CP V5.2 or higher The range of functions of the CP 343 −1 Lean (CX00) can be configured. V5.4 or higher Requirement for configuring the full functionality of the CP 343 −1 Lean (CX10 with firmware V1.0) including PROFINE
Краткое содержание страницы № 8
2 Requirements for Use 2 Requirements for Use General Operation The CP can be operated in the following device families: S7 −300 stations with the CPU types − Standard − Compact − Modular C7 control systems in C7 packaging system The following tables show the devices with which the CP can be operated with this range of functions: Notice The tables list the CPUs and devices approved at the time of printing this manual. S7-300 CPUs or C7 or C7 control systems approved later and not listed in
Краткое содержание страницы № 9
2 Requirements for Use Table 2-1 Use of the CP with S7 −300 CPU Order Number CPU 314 IFM 6ES7 314 −5AE03 −0AB0 6ES7 314 −5AE10 −0AB0 CPU 314C −2 DP 6ES7 314 −6CF00 −0AB0 6ES7 314 −6CF02 −0AB0 6ES7 314 −6CG03 −0AB0 CPU 314C −2 PtP 6ES7 314 −6BF00 −0AB0 6ES7 314 −6BF01 −0AB0 6ES7 314 −6BF02 −0AB0 6ES7 314 −6BG03 −0AB0 CPU 315 6ES7 315 −1AF03 −0AB0 CPU 315 −2 DP 6ES7 315 −2AF03 −0AB0 6ES7 315 −2AG10 −0AB0 CPU 315 −2 PN/DP 6ES7 315 −2EG10 −0AB0 6ES7 315 −2EH13 −0AB0 CPU 315F −2 DP 6ES7 315 −6FF01 −0
Краткое содержание страницы № 10
2 Requirements for Use Table 2-2 Use of the CP in C7 Control Systems C7 Order Number C7 −613 6ES7 613 −1CA01 −0AE03 6ES7 613 −1CA02 −0AE3 C7 −633 DP 6ES7 633 −2BF02 −0AE03 C7 −635 Keys 6ES7 635 −2EC01 −0AE3 6ES7 635 −2EC02 −0AE3 C7 −635 Touch 6ES7 635 −2EB01 −0AE03 6ES7 635 −2EB02 −0AE3 C7 −636 Keys 6ES7 636 −2EC00 −0AE03 6ES7 636 −2EC00 −0AE3 C7 −636 Touch 6ES7 636 −2EB00 −0AE3 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L B3L −10 Release 03/2007 C79000-G8976-C198-04
Краткое содержание страницы № 11
3 Installation and Commissioning 3 Installation and Commissioning 3.1 Procedure / Steps Step Explanation / Meaning 1. Install the CP on the S7 standard rail. Slots 4 to 11 are permitted for the CP in racks 0 to 3 (connected by IM 360/361). 2. Establish the connection via the enclosed bus connector to the backplane bus. Proceed as in the sections dealing with setup and wiring, described in detail in /1/. Note The CP cannot be used in an extension rack that is connected via the IM 365! Reason: T
Краткое содержание страницы № 12
3 Installation and Commissioning Attachment to Industrial Slider for setting Ethernet: the chassis 2 x 8-pin RJ-45 jack ground contact Figure 3-1 Connectors of a CP 343 −1 Lean with the Front Panel Open Ground/Chassis Ground Concept Notice Please note the instructions regarding the grounding and chassis ground concept in the SIMATIC S7 installation guides; see “SIMATIC S7 Programmable Controller S7 −300 − Installation and Hardware: Installation Manual” /1/. Behind the hinged panel on the left of
Краткое содержание страницы № 13
3 Installation and Commissioning Note The hinged front panel must be kept closed during operation. The module must be installed so that its upper and lower ventilation slits are not covered, allowing adequate ventilation. Warning ! When used under hazardous conditions (zone 2), the devices must be installed in an enclosure. To comply with ATEX100a (EN 60079 −15), this enclosure must meet the requirements of at least IP54 in compliance with EN 60529. WARNING − EXPLOSION HAZARD: DO NOT DISCONNECT
Краткое содержание страницы № 14
4 Displays 4 Displays The display on the front panel consists of 8 LEDs that indicate the operating mode and the communication status. Front panel: SF BF DC5V RX/TX P1 RUN P2 STOP The LEDs have the following meaning: SF: Group error BF: Bus fault PROFINET IO DCV5: DC 5 V power supply via the backplane bus (green = OK) RX/TX: Acyclic data exchange, for example Send/Receive (not relevant for PROFINET IO data) RUN: RUN mode STOP: STOP mode P1 / P2: Link status of Ethernet port 1 / p
Краткое содержание страницы № 15
4 Displays LEDs for displaying the mode The different combinations of the LEDs on the front panel indicate the status: SF(red) BF (red) RUN STOP CP Operating Mode (green) (yellow) Starting up after power “ON” or Stopped (STOP) with errors − In this state, the CPU or intelligent modules in the rack remain accessible using PG functions. Starting up (STOP->RUN) Running (RUN) Stopping (RUN->STOP) Stopped (STOP) In the STOP mode configuring and performing diagnostics on the CP remain possible. −
Краткое содержание страницы № 16
4 Displays LEDs for displaying the CP communication status In addition to the LEDs that signal the CP state, the following LEDs provide information about the status of the CP interface to Industrial Ethernet. Table 4-1 LED Display Meaning RX/TX (green) The CP is sending/receiving over Industrial Ethernet Note: Sending / receiving over PROFINET IO is not signaled here. P1 / P2 Port has no connection to (green / yellow) Industrial Ethernet. green Existing connection over port to Industrial Ethern
Краткое содержание страницы № 17
5 Performance Data 5 Performance Data 5.1 Number of Possible Connections over Ethernet Table 5-1 Characteristic Explanation / Values Permitted number of simultaneous connections in 12 maximum total over Industrial Ethernet Example of Maximum Load You can operate: 4 S7 connections 4 ISO-on-TCP connections 2 TCP connections 2 UDP connections Also: Further TCP connections for Web diagnostics 1 PROFINET connection to a PROFINET IO controller 5.2 Characteristic Data for S7 Communication Table
Краткое содержание страницы № 18
5 Performance Data 5.3 Characteristics of the SEND/RECEIVE Interface Table 5-3 Characteristic Explanation / Values Number of ISO-on-TCP connections + TCP 8 maximum connections + UDP connections in total Notes: All UDP connections are also possible in the multicast mode Free UDP connections are supported by the CP. Max. data length for blocks AG_SEND (V4.0 and AG_SEND and AG_RECV allow the transfer of higher) and AG_RECV (V4.0 and higher) data fields of between 1 and 240 bytes. 1 to 8192
Краткое содержание страницы № 19
5 Performance Data 5.4 Characteristic Data for PROFINET IO CP as PROFINET IO device The CP supports the following maximum configuration as a PROFINET IO device: Table 5-5 Explanation / Values Characteristic Size of the input area of the PROFINET IO device 512 bytes max. Size of the output area of the PROFINET IO device 512 bytes max. Size of the IO data area per submodule in a PROFINET IO device Inputs 240 bytes Outputs 240 bytes Size of the consistency area for a submodule 240 bytes Maximu
Краткое содержание страницы № 20
6 Configuring and Programming the CP as a PROFINET IO Device 6 Configuring and Programming the CP as a PROFINET IO Device “Intelligent” PROFINET IO Device A CP 343 −1 Lean can be configured so that the SIMATIC 300 station can be addressed as a PROFINET IO device. Due to the programmability of SIMATIC 300 stations, they are also known as “intelligent” PROFINET IO devices because: Process data can be processed before it is forwarded to the PROFINET IO controller or after it has been received fro
Loading…
Краткое содержание страницы № 1
SIMATIC NET
S7-CPs for Industrial Ethernet
Manual Part B3L
CP 343-1 Lean
6GK7 343 −1CX10 −0XE0 as of hardware version 2, as of firmware version V2.0
for SIMATIC S7 −300 / C7 −300
LED displays
TP port:
2 x 8 −pin RJ −45 socket
(beneath the front panel)
X = Placeholder for hardware
version
Release 03/2007
C79000-G8976-C198-04
Краткое содержание страницы № 2
Notes on the Product Notes on the Product Product Names This description contains information on the following product CP 343 −1 Lean Order number 6GK7 343 −1CX10 −0XE0 as of hardware version 2 and firmware version V2.0 for SIMATIC S7 −300 / C7 −300 Note In this document, the term CP is used instead of the full product name. Printed Product Information Supplied with the Product Note All the notices in the Product Information Bulletin shipped with this device must be adhered to. Compatibility w
Краткое содержание страницы № 3
Contents Contents Contents − Part A Ethernet CPs − General information . . . . . . . . . . . . . . . . . . . see general part Note Please remember that Part A of the device manual also belongs to the description of the CP. Among other things, it contains explanations of the safety notices and general information that applies to all S7 CPs for Industrial Ethernet. You will find the references in this Part B of the manual /…/ in the Appendix of the general Part A of the manual. The following ver
Краткое содержание страницы № 4
Contents 6.4.2 Initialization and Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L −28 6.5 Example of Configuration and Programming . . . . . . . . . . . . . . . . . . . . . B3L −30 7 Web Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−33 7.1 Requirements and Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L −33 7.2 Diagnostics Pages of the CP . .
Краткое содержание страницы № 5
1 Properties / Services 1 Properties / Services Application The CP 343 −1 Lean communications processor is designed for operation in a SIMATIC S7-300 programmable logic controller. It allows attachment of the S7 −300 to Industrial Ethernet and supports PROFINET IO. A 2-port switch with autocrossing, autonegotiation and autosensing was integrated in the CP for simple integration in a line or for attaching a further Ethernet device. Services The CP supports the following communication services:
Краткое содержание страницы № 6
1 Properties / Services Time-of-day synchronization over Industrial Ethernet using the following configurable modes: − SIMATIC mode The CP receives MMS time frames and synchronizes its local time and the time of the CPU (accuracy approx. +/ − 1 second); or − NTP mode (NTP: Network Time Protocol) The CP sends time-of-day queries at regular intervals to an NTP server and synchronizes its local time of day and the time of the CPU (accuracy approx. +/ − 1 second). Time of day for the diagnostic
Краткое содержание страницы № 7
1 Properties / Services Configuration It is possible to download the configuration data to the CP over MPI or LAN/Industrial Ethernet. You require STEP 7 with NCM S7 for Industrial Ethernet (NCM IE) with the following version: Table 1-1 Version STEP 7 / NCM IE Functions of the CP V5.2 or higher The range of functions of the CP 343 −1 Lean (CX00) can be configured. V5.4 or higher Requirement for configuring the full functionality of the CP 343 −1 Lean (CX10 with firmware V1.0) including PROFINE
Краткое содержание страницы № 8
2 Requirements for Use 2 Requirements for Use General Operation The CP can be operated in the following device families: S7 −300 stations with the CPU types − Standard − Compact − Modular C7 control systems in C7 packaging system The following tables show the devices with which the CP can be operated with this range of functions: Notice The tables list the CPUs and devices approved at the time of printing this manual. S7-300 CPUs or C7 or C7 control systems approved later and not listed in
Краткое содержание страницы № 9
2 Requirements for Use Table 2-1 Use of the CP with S7 −300 CPU Order Number CPU 314 IFM 6ES7 314 −5AE03 −0AB0 6ES7 314 −5AE10 −0AB0 CPU 314C −2 DP 6ES7 314 −6CF00 −0AB0 6ES7 314 −6CF02 −0AB0 6ES7 314 −6CG03 −0AB0 CPU 314C −2 PtP 6ES7 314 −6BF00 −0AB0 6ES7 314 −6BF01 −0AB0 6ES7 314 −6BF02 −0AB0 6ES7 314 −6BG03 −0AB0 CPU 315 6ES7 315 −1AF03 −0AB0 CPU 315 −2 DP 6ES7 315 −2AF03 −0AB0 6ES7 315 −2AG10 −0AB0 CPU 315 −2 PN/DP 6ES7 315 −2EG10 −0AB0 6ES7 315 −2EH13 −0AB0 CPU 315F −2 DP 6ES7 315 −6FF01 −0
Краткое содержание страницы № 10
2 Requirements for Use Table 2-2 Use of the CP in C7 Control Systems C7 Order Number C7 −613 6ES7 613 −1CA01 −0AE03 6ES7 613 −1CA02 −0AE3 C7 −633 DP 6ES7 633 −2BF02 −0AE03 C7 −635 Keys 6ES7 635 −2EC01 −0AE3 6ES7 635 −2EC02 −0AE3 C7 −635 Touch 6ES7 635 −2EB01 −0AE03 6ES7 635 −2EB02 −0AE3 C7 −636 Keys 6ES7 636 −2EC00 −0AE03 6ES7 636 −2EC00 −0AE3 C7 −636 Touch 6ES7 636 −2EB00 −0AE3 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L B3L −10 Release 03/2007 C79000-G8976-C198-04
Краткое содержание страницы № 11
3 Installation and Commissioning 3 Installation and Commissioning 3.1 Procedure / Steps Step Explanation / Meaning 1. Install the CP on the S7 standard rail. Slots 4 to 11 are permitted for the CP in racks 0 to 3 (connected by IM 360/361). 2. Establish the connection via the enclosed bus connector to the backplane bus. Proceed as in the sections dealing with setup and wiring, described in detail in /1/. Note The CP cannot be used in an extension rack that is connected via the IM 365! Reason: T
Краткое содержание страницы № 12
3 Installation and Commissioning Attachment to Industrial Slider for setting Ethernet: the chassis 2 x 8-pin RJ-45 jack ground contact Figure 3-1 Connectors of a CP 343 −1 Lean with the Front Panel Open Ground/Chassis Ground Concept Notice Please note the instructions regarding the grounding and chassis ground concept in the SIMATIC S7 installation guides; see “SIMATIC S7 Programmable Controller S7 −300 − Installation and Hardware: Installation Manual” /1/. Behind the hinged panel on the left of
Краткое содержание страницы № 13
3 Installation and Commissioning Note The hinged front panel must be kept closed during operation. The module must be installed so that its upper and lower ventilation slits are not covered, allowing adequate ventilation. Warning ! When used under hazardous conditions (zone 2), the devices must be installed in an enclosure. To comply with ATEX100a (EN 60079 −15), this enclosure must meet the requirements of at least IP54 in compliance with EN 60529. WARNING − EXPLOSION HAZARD: DO NOT DISCONNECT
Краткое содержание страницы № 14
4 Displays 4 Displays The display on the front panel consists of 8 LEDs that indicate the operating mode and the communication status. Front panel: SF BF DC5V RX/TX P1 RUN P2 STOP The LEDs have the following meaning: SF: Group error BF: Bus fault PROFINET IO DCV5: DC 5 V power supply via the backplane bus (green = OK) RX/TX: Acyclic data exchange, for example Send/Receive (not relevant for PROFINET IO data) RUN: RUN mode STOP: STOP mode P1 / P2: Link status of Ethernet port 1 / p
Краткое содержание страницы № 15
4 Displays LEDs for displaying the mode The different combinations of the LEDs on the front panel indicate the status: SF(red) BF (red) RUN STOP CP Operating Mode (green) (yellow) Starting up after power “ON” or Stopped (STOP) with errors − In this state, the CPU or intelligent modules in the rack remain accessible using PG functions. Starting up (STOP->RUN) Running (RUN) Stopping (RUN->STOP) Stopped (STOP) In the STOP mode configuring and performing diagnostics on the CP remain possible. −
Краткое содержание страницы № 16
4 Displays LEDs for displaying the CP communication status In addition to the LEDs that signal the CP state, the following LEDs provide information about the status of the CP interface to Industrial Ethernet. Table 4-1 LED Display Meaning RX/TX (green) The CP is sending/receiving over Industrial Ethernet Note: Sending / receiving over PROFINET IO is not signaled here. P1 / P2 Port has no connection to (green / yellow) Industrial Ethernet. green Existing connection over port to Industrial Ethern
Краткое содержание страницы № 17
5 Performance Data 5 Performance Data 5.1 Number of Possible Connections over Ethernet Table 5-1 Characteristic Explanation / Values Permitted number of simultaneous connections in 12 maximum total over Industrial Ethernet Example of Maximum Load You can operate: 4 S7 connections 4 ISO-on-TCP connections 2 TCP connections 2 UDP connections Also: Further TCP connections for Web diagnostics 1 PROFINET connection to a PROFINET IO controller 5.2 Characteristic Data for S7 Communication Table
Краткое содержание страницы № 18
5 Performance Data 5.3 Characteristics of the SEND/RECEIVE Interface Table 5-3 Characteristic Explanation / Values Number of ISO-on-TCP connections + TCP 8 maximum connections + UDP connections in total Notes: All UDP connections are also possible in the multicast mode Free UDP connections are supported by the CP. Max. data length for blocks AG_SEND (V4.0 and AG_SEND and AG_RECV allow the transfer of higher) and AG_RECV (V4.0 and higher) data fields of between 1 and 240 bytes. 1 to 8192
Краткое содержание страницы № 19
5 Performance Data 5.4 Characteristic Data for PROFINET IO CP as PROFINET IO device The CP supports the following maximum configuration as a PROFINET IO device: Table 5-5 Explanation / Values Characteristic Size of the input area of the PROFINET IO device 512 bytes max. Size of the output area of the PROFINET IO device 512 bytes max. Size of the IO data area per submodule in a PROFINET IO device Inputs 240 bytes Outputs 240 bytes Size of the consistency area for a submodule 240 bytes Maximu
Краткое содержание страницы № 20
6 Configuring and Programming the CP as a PROFINET IO Device 6 Configuring and Programming the CP as a PROFINET IO Device “Intelligent” PROFINET IO Device A CP 343 −1 Lean can be configured so that the SIMATIC 300 station can be addressed as a PROFINET IO device. Due to the programmability of SIMATIC 300 stations, they are also known as “intelligent” PROFINET IO devices because: Process data can be processed before it is forwarded to the PROFINET IO controller or after it has been received fro
SIMATIC NET S7-CPs for Industrial Ethernet Manual Part B3L CP 343-1 Lean 6GK7 343−1CX10−0XE0 as of hardware version 2, as of firmware version V2.0 for SIMATIC S7−300 / C7−300 LED displays TP port: 2 x 8−pin RJ−45 socket (beneath the front panel) X = Placeholder for hardware version Release 03/2007 C79000-G8976-C198-04 Notes on the Product Notes on the Product Product Names This description contains information on the following product S CP 343−1 Lean Order number 6GK7 343−1CX10−0XE0 as of hardware version 2 and firmware version V2.0 for SIMATIC S7−300 / C7−300 Note In this document, the term CP is used instead of the full product name. Printed Product Information Supplied with the Product Note All the notices in the Product Information Bulletin shipped with this device must be adhered to. Compatibility with the Previous Version Note Due to the increased functionality and restrictions, pay particular attention to the notes in Chapter 8 of this manual. Address label: Unique MAC address preset for the CP The CP ships with a factory-set MAC address. To ensure a unique address assignment, we recommend that you use this factory set MAC address when configuring the module! - B3L−2 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 Contents Contents Contents − Part A Ethernet CPs − General information . . . . . . . . . . . . . . . . . . . see general part Note Please remember that Part A of the device manual also belongs to the description of the CP. Among other things, it contains explanations of the safety notices and general information that applies to all S7 CPs for Industrial Ethernet. You will find the references in this Part B of the manual /.../ in the Appendix of the general Part A of the manual. The following version of the manual Part A of the manual belongs to this version of Part B: Release 01/2007 You can download the general Part from the Internet: http://www4.ad.siemens.de/view/cs/en/8777865 Contents − Part B3L 1 Properties / Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−5 2 Requirements for Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−8 3 Installation and Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−11 3.1 Procedure / Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−11 4 Displays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−14 5 Performance Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−17 6 5.1 Number of Possible Connections over Ethernet . . . . . . . . . . . . . . . . . . . B3L−17 5.2 Characteristic Data for S7 Communication . . . . . . . . . . . . . . . . . . . . . . . B3L−17 5.3 Characteristics of the SEND/RECEIVE Interface . . . . . . . . . . . . . . . . . B3L−18 5.4 Characteristic Data for PROFINET IO . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−19 Configuring and Programming the CP as a PROFINET IO Device . . . . . . . . . . B3L−20 6.1 Overview of the Preparatory Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−20 6.2 Principle of Data Exchange over PROFINET IO . . . . . . . . . . . . . . . . . . B3L−21 6.3 6.3.1 6.3.2 Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installing the CP and Specifying it as PROFINET IO Device . . . . . . . . Assigning the PROFINET IO Device to a PROFINET IO Controller . . B3L−22 B3L−22 B3L−24 6.4 6.4.1 Programming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Interface for Programming on the PROFINET IO Device . . . . . . . . . . . B3L−27 B3L−27 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−3 Contents 7 8 9 6.4.2 Initialization and Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−28 6.5 Example of Configuration and Programming . . . . . . . . . . . . . . . . . . . . . B3L−30 Web Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−33 7.1 Requirements and Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−33 7.2 7.2.1 7.2.2 7.2.3 7.2.4 7.2.5 7.2.6 Diagnostics Pages of the CP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Start Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rack Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Diagnostic Buffer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Industrial Ethernet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PROFINET IO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−34 B3L−35 B3L−36 B3L−37 B3L−39 B3L−40 B3L−42 Compatibility with Predecessor Products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−44 8.1 Extended Functionality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−44 8.2 Replacing Older Modules / Replacing Faulty Modules . . . . . . . . . . . . . B3L−44 Further Notes on Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−46 9.1 Memory Reset . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−46 9.2 Working with Fast Ethernet − automatic switchover . . . . . . . . . . . . . . . B3L−47 9.3 SNMP Agent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−49 9.4 Possible Security Gaps on Standard IT Interfaces / Preventing Illegal Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−50 9.5 Influence of MPI on Connections via Industrial Ethernet . . . . . . . . . . . B3L−50 9.6 Special Features of IP Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−51 9.7 Reserved Port Numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−51 9.8 Restart after Detection of a Duplicate IP Address in the Network . . . . B3L−52 9.9 Obtaining the IP Address over DHCP − CP STOP on Expiry of the Lease . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−52 9.10 Other information available about the CP . . . . . . . . . . . . . . . . . . . . . . . . B3L−52 10 How to Load New Firmware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−53 11 B3L−54 Technical Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B3L−4 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 1 1 Properties / Services Properties / Services Application The CP 343−1 Lean communications processor is designed for operation in a SIMATIC S7-300 programmable logic controller. It allows attachment of the S7−300 to Industrial Ethernet and supports PROFINET IO. A 2-port switch with autocrossing, autonegotiation and autosensing was integrated in the CP for simple integration in a line or for attaching a further Ethernet device. Services The CP supports the following communication services: S PROFINET IO device Integration of the SIMATIC S7−300 programmable controller over the CP as intelligent PROFINET IO device. S S7 communication and PG/OP communication − PG functions (including routing) − Operator control and monitoring functions (HMI) − Server for data exchange on S7 connections configured at one end only without communication blocks on the S7-300 / C7-300 station S S5 compatible communication with − SEND/RECEIVE interface over ISO-on-TCP, TCP and UDP connections − Multicast over UDP connection The multicast mode is made possible by selecting a suitable IP address when configuring connections. − FETCH/WRITE services (server; corresponding to S5 protocol) via ISO-on-TCP connections and TCP connections; The addressing mode can be configured for FETCH/WRITE access as the S7 or S5 addressing mode. − LOCK/UNLOCK with FETCH/WRITE services; CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−5 1 Properties / Services S Time-of-day synchronization over Industrial Ethernet using the following configurable modes: − SIMATIC mode The CP receives MMS time frames and synchronizes its local time and the time of the CPU (accuracy approx. +/− 1 second); or − NTP mode (NTP: Network Time Protocol) The CP sends time-of-day queries at regular intervals to an NTP server and synchronizes its local time of day and the time of the CPU (accuracy approx. +/− 1 second). S Time of day for the diagnostic buffer If a time master exists (using the NTP or SIMATIC mode), the time for the CP-internal diagnostic buffer is synchronized over the LAN (accuracy approx. +/− 10 ms) S Addressing using a factory-set MAC address The CP can be reached over the default MAC address to allow an IP address to be assigned. S SNMP Agent The CP supports data queries over SNMP in version V1 (Simple Network Management Protocol) according to the MIB II and LLDP MIB standard. You will find more information on MIB in the manual “Commissioning PC Stations” on the SIMATIC NET Manual Collection or at the following SIMATIC NET Internet page: http://support.automation.siemens.com/WW/view/en/15177711 S IP configuration You can configure how and with which method the CP is assigned the IP address, the subnet mask and the address of a default router. It is also possible, as an alternative, to assign the connection configuration to the CP using STEP 7 or using a block interface in the user program (FB55: IP_CONFIG) (see /Part A/). S Web diagnostics With the aid of Web diagnostics, you can read out the diagnostic data from a station connected over the CP to a PG/PC with an Internet browser. B3L−6 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 1 Properties / Services Configuration It is possible to download the configuration data to the CP over MPI or LAN/Industrial Ethernet. You require STEP 7 with NCM S7 for Industrial Ethernet (NCM IE) with the following version: Table 1-1 Version STEP 7 / NCM IE Functions of the CP V5.2 or higher The range of functions of the CP 343−1 Lean (CX00) can be configured. V5.4 or higher Requirement for configuring the full functionality of the CP 343−1 Lean (CX10 with firmware V1.0) including PROFINET IO. V5.4 Service Pack 2 *) Requirement for configuring the full functionality of the CP 343−1 Lean (CX10 with firmware V2.0) including Web diagnostics. *) To use the CP with V5.4 Service Pack 1, you will need to install Hotfix 2, the corresponding hardware update and a block setup. You will find more information at the following Internet page: http://www4.ad.siemens.de/WW/news/en/24463868 Programming − Using Blocks For some communications services, there are pre-programmed blocks (FCs/FBs) available as the interface in your STEP 7 user program. You will find a detailed description of these blocks in the NCM S7 for Ethernet manuals. Notice We recommend that you always use the latest block versions for all module types. You will find information on the latest block version and links to download the current blocks in our Customer Support area on the Internet: http://www4.ad.siemens.de/WW/news/en/8797900 If you are using older block types, this recommendation only applies if you also have the latest firmware version. You will find further information and Internet addresses in the Preface of the General Part of this manual. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−7 2 2 Requirements for Use Requirements for Use General Operation The CP can be operated in the following device families: S S7−300 stations with the CPU types − Standard − Compact − Modular S C7 control systems in C7 packaging system The following tables show the devices with which the CP can be operated with this range of functions: Notice The tables list the CPUs and devices approved at the time of printing this manual. S7-300 CPUs or C7 or C7 control systems approved later and not listed in the table also support the range of functions described here. Table 2-1 Use of the CP with S7−300 CPU B3L−8 Order Number CPU 312 6ES7 312−1AD10−0AB0 6ES7 312−1AE13−0AB0 CPU 312C 6ES7 312−5BD01−0AB0 6ES7 312−5BE03−0AB0 CPU 312 IFM 6ES7 312−5AC02−0AB0 CPU 313 6ES7 313−1AD03−0AB0 CPU 313C 6ES7 313−5BE00−0AB0 6ES7 313−5BE01−0AB0 6ES7 313−5BF03−0AB0 CPU 313C−2 DP 6ES7 313−6CE00−0AB0 6ES7 313−6CE01−0AB0 6ES7 313−6CF03−0AB0 CPU 313C−2 PtP 6ES7 313−6BE00−0AB0 6ES7 313−6BE01−0AB0 6ES7 313−6BF03−0AB0 CPU 314 6ES7 314−6AE01−0AB0 6ES7 314−6AE02−0AB0 6ES7 314−6AE03−0AB0 6ES7 314−6AE04−0AB0 6ES7 314−1AF10−0AB0 6ES7 314−1AF11−0AB0 6ES7 314−1AG13−0AB0 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 2 Table 2-1 Requirements for Use Use of the CP with S7−300 CPU Order Number CPU 314 IFM 6ES7 314−5AE03−0AB0 6ES7 314−5AE10−0AB0 CPU 314C−2 DP 6ES7 314−6CF00−0AB0 6ES7 314−6CF02−0AB0 6ES7 314−6CG03−0AB0 CPU 314C−2 PtP 6ES7 314−6BF00−0AB0 6ES7 314−6BF01−0AB0 6ES7 314−6BF02−0AB0 6ES7 314−6BG03−0AB0 CPU 315 6ES7 315−1AF03−0AB0 CPU 315−2 DP 6ES7 315−2AF03−0AB0 6ES7 315−2AG10−0AB0 CPU 315−2 PN/DP 6ES7 315−2EG10−0AB0 6ES7 315−2EH13−0AB0 CPU 315F−2 DP 6ES7 315−6FF01−0AB0 CPU 315F−2 PN/DP 6ES7 315−2FH10−0AB0 6ES7 315−2FH13−0AB0 CPU 316 6ES7 316−1AG00−0AB0 CPU 316−2 DP 6ES7 316−2AG00−0AB0 CPU 317−2 DP 6ES7 317−2AJ10−0AB0 CPU 317−2 PN/DP 6ES7 317−2EJ10−0AB0 6ES7 317−2EK13−0AB0 CPU 317F−2 DP 6ES7 317−6FF00−0AB0 6ES7 317−6FF03−0AB0 CPU 317F−2 PN/DP 6ES7 317−2FJ10−0AB0 6ES7 317−2FK13−0AB0 CPU 318−2 6ES7 318−2AJ00−0AB0 CPU 319−3 PN/DP 6ES7 318−3EL00−0AB0 CPU 614 6ES7 614−1AH03−0AB3 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−9 2 Requirements for Use Table 2-2 Use of the CP in C7 Control Systems C7 B3L−10 Order Number C7−613 6ES7 613−1CA01−0AE03 6ES7 613−1CA02−0AE3 C7−633 DP 6ES7 633−2BF02−0AE03 C7−635 Keys 6ES7 635−2EC01−0AE3 6ES7 635−2EC02−0AE3 C7−635 Touch 6ES7 635−2EB01−0AE03 6ES7 635−2EB02−0AE3 C7−636 Keys 6ES7 636−2EC00−0AE03 6ES7 636−2EC00−0AE3 C7−636 Touch 6ES7 636−2EB00−0AE3 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 3 3 Installation and Commissioning Installation and Commissioning 3.1 Procedure / Steps Step 1. Install the CP on the S7 standard rail. 2. Establish the connection via the enclosed bus connector to the backplane bus. Explanation / Meaning Slots 4 to 11 are permitted for the CP in racks 0 to 3 (connected by IM 360/361). Proceed as in the sections dealing with setup and wiring, described in detail in /1/. Note The CP cannot be used in an extension rack that is connected via the IM 365! Reason: The required communication bus is not connected to the extension rack via the IM 365. 3. Connect the CP to the power supply. Follow the steps as described in detail in /1/ when wiring between the power supply and the CPU. Notes S The CPU, CP and IM (if one exists) must be connected to the same power supply. S Only wire up the S7-300 / C7-300 with the power switched off! 4. Attach the CP to Industrial Ethernet. 5. The remaining steps in commissioning involve downloading the configuration data. To download the configuration, you can connect the PG as follows: S via MPI S via Industrial Ethernet For further details, refer to the general Part A of this manual: − addressing the first time (IP address assignment / node initialization); − downloading the defined configuration The PG/PC requires a LAN attachment, for example via a CP 1613 or CP 1411 and must have the necessary software (for example the S7-1613 package or SOFTNET IE). The TCP/IP protocol must be installed. The protocol used must then be applied to the S7ONLINE access point. 6. User diagnostics for commissioning and to analyze problems. The following options are available: S The LED displays on the CP S Hardware diagnostics and troubleshooting with STEP 7 S Communication diagnostics with STEP 7 / NCM Diagnostics S Standard information using HW Config S Web diagnostics S If applicable, evaluation of the alarm block FB54 in the user program CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−11 3 Installation and Commissioning Attachment to Industrial Ethernet: Slider for setting the chassis ground contact Figure 3-1 2 x 8-pin RJ-45 jack Connectors of a CP 343−1 Lean with the Front Panel Open Ground/Chassis Ground Concept Notice Please note the instructions regarding the grounding and chassis ground concept in the SIMATIC S7 installation guides; see “SIMATIC S7 Programmable Controller S7−300 − Installation and Hardware: Installation Manual” /1/. Behind the hinged panel on the left of the device, you will see a slider with which you can connect or disconnect the chassis ground of the 24 V power supply with reference ground. S Slider pushed in: chassis and reference ground connected (note: the slider must be felt to lock in place). S Slider pulled out: No connection between chassis and reference ground. When shipped: Slider pushed in Use a screwdriver to set the slider. Note An Ethernet cable can also be inserted and removed with the power supply on. B3L−12 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 3 Installation and Commissioning Note The hinged front panel must be kept closed during operation. The module must be installed so that its upper and lower ventilation slits are not covered, allowing adequate ventilation. ! Warning When used under hazardous conditions (zone 2), the devices must be installed in an enclosure. To comply with ATEX100a (EN 60079−15), this enclosure must meet the requirements of at least IP54 in compliance with EN 60529. WARNING − EXPLOSION HAZARD: DO NOT DISCONNECT EQUIPMENT WHEN A FLAMMABLE OR COMBUSTIBLE ATMOSPHERE IS PRESENT. ! Warning The device is designed for operation with safety extra-low voltage (SELV). This means that only safety extra-low voltages (SELV) complying with IEC950/EN60950/ VDE0805 may be connected to the power supply terminals. The power unit for supplying the device must comply with NEC Class 2 as described by the National Electrical Code(r) (ANSI/NFPA 70). The power of all connected power units in total must correspond to a limited power source (LPS). CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−13 4 4 Displays Displays The display on the front panel consists of 8 LEDs that indicate the operating mode and the communication status. Front panel: SF BF DC5V RX/TX RUN STOP P1 P2 The LEDs have the following meaning: B3L−14 S SF: Group error S BF: Bus fault PROFINET IO S DCV5: DC 5 V power supply via the backplane bus (green = OK) S RX/TX: Acyclic data exchange, for example Send/Receive (not relevant for PROFINET IO data) S RUN: S STOP: STOP mode S P1 / P2: Link status of Ethernet port 1 / port 2 RUN mode CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 4 Displays LEDs for displaying the mode The different combinations of the LEDs on the front panel indicate the status: SF(red) BF (red) RUN (green) STOP (yellow) CP Operating Mode S Starting up after power “ON” or S Stopped (STOP) with errors − In this state, the CPU or intelligent modules in the rack remain accessible using PG functions. Starting up (STOP->RUN) Running (RUN) Stopping (RUN->STOP) Stopped (STOP) In the STOP mode configuring and performing diagnostics on the CP remain possible. − − − S No LAN cable plugged in or S Duplicate IP address detected − − − The CP is configured as a PROFINET IO device; there is no data exchange with the PROFINET IO controller Module fault / system error Downloading firmware. Firmware was successfully downloaded. Firmware could not be downloaded. Legend: (colored) on off CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 (colored) flashing “−” any B3L−15 4 Displays LEDs for displaying the CP communication status In addition to the LEDs that signal the CP state, the following LEDs provide information about the status of the CP interface to Industrial Ethernet. Table 4-1 Display LED Meaning The CP is sending/receiving over Industrial Ethernet RX/TX (green) Note: Sending / receiving over PROFINET IO is not signaled here. Port has no connection to Industrial Ethernet. P1 / P2 (green / yellow) green Existing connection over port to Industrial Ethernet (LINK status). green / yellow LED flashes yellow (constant light green): Port sending/receiving over Industrial Ethernet or PROFINET IO. Note: All received / sent frames are signaled for each specific port including those simply forwarded by the switch. yellow P1 / P2 (green / yellow) Legend: B3L−16 (colored) on off Continuous data transfer at the port over Industrial Ethernet (for example PROFINET IO). (colored) flashing “−” any CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 5 5 Performance Data Performance Data 5.1 Number of Possible Connections over Ethernet Table 5-1 Characteristic Explanation / Values Permitted number of simultaneous connections in total over Industrial Ethernet 12 maximum Example of Maximum Load You can operate: 4 S7 connections 4 ISO-on-TCP connections 2 TCP connections 2 UDP connections Also: 5.2 S Further TCP connections for Web diagnostics S 1 PROFINET connection to a PROFINET IO controller Characteristic Data for S7 Communication Table 5-2 Characteristic Explanation / Values Number of connections for S7 communication on Industrial Ethernet for 4 maximum (the number depends on the CPU type being used. S Operator control and monitoring functions (HMI) Please refer to /1/ for the values for your CPU.) S S7 connections configured at one end LAN interface − data record length per protocol unit S sending S receiving CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 240 bytes / PDU 240 bytes / PDU B3L−17 5 Performance Data 5.3 Characteristics of the SEND/RECEIVE Interface Table 5-3 Characteristic Explanation / Values Number of ISO-on-TCP connections + TCP connections + UDP connections in total 8 maximum Notes: S All UDP connections are also possible in the multicast mode S Free UDP connections are supported by the CP. Max. data length for blocks AG_SEND (V4.0 and higher) and AG_RECV (V4.0 and higher) AG_SEND and AG_RECV allow the transfer of data fields of between 1 and 240 bytes. S 1 to 8192 bytes for ISO-on-TCP, TCP; S 1 to 2048 bytes for UDP Restrictions for UDP S Transfer is not confirmed The transmission of UDP frames is unconfirmed, in other words the loss of messages is not detected or displayed by the send blocks (AG_SEND). S Data field length The maximum length of the data fields is 2048 bytes. S No reception of UDP broadcast To avoid communication overload resulting from a high broadcast load, the CP does not permit reception of UDP broadcast. Execution Times of the FCs AG_SEND / AG_RECV To calculate the CPU cycle times (OB1) with SEND/RECEIVE connections, the execution time for the FCs (FC AG_SEND, FC AG_RECV) required for processing on the S7−300 / C7−300 CPU is the decisive factor. Table 5-4 Component Explanation / Values Execution time on the CPU 315−2 DP (6ES7 315−2EG10−0AB0) per AG_SEND block call: per AG_RECV block call: S <1 ms at <= 240 bytes S <1 ms at <= 240 bytes Execution time on the CPU 317−2 PN/DP (6ES7 317−2EJ10−0AB0) per AG_SEND block call: per AG_RECV block call: S <0.8 ms at <= 240 bytes S <0.8 ms at <= 240 bytes B3L−18 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 5 5.4 Performance Data Characteristic Data for PROFINET IO CP as PROFINET IO device The CP supports the following maximum configuration as a PROFINET IO device: Table 5-5 Explanation / Values Characteristic Size of the input area of the PROFINET IO device 512 bytes max. Size of the output area of the PROFINET IO device 512 bytes max. Size of the IO data area per submodule in a PROFINET IO device S Inputs S Outputs 240 bytes Size of the consistency area for a submodule 240 bytes 240 bytes Maximum number of submodules 32 Execution times of the FCs PNIO_SEND / PNIO_RECV The calculation of the reaction times with PROFINET IO is determined by the execution time of the function blocks required on the S7-300 CPU (PNIO_SEND, PNIO_RECV). Table 5-6 Explanation / Values Component Execution time on the CPU 315−2DP (6ES7 315−2EG10−0AB0) per PNIO_SEND block call: per PNIO_RECV block call: S < 1 ms at 240 bytes S < 1 ms at 240 bytes Execution time on the CPU 317−2PN/DP (6ES7 317−2EJ10−0AB0) per PNIO_SEND block call: per PNIO_RECV block call: S < 0.8 ms at 240 bytes S < 0.8 ms at 240 bytes CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−19 6 Configuring and Programming the CP as a PROFINET IO Device 6 Configuring and Programming the CP as a PROFINET IO Device “Intelligent” PROFINET IO Device A CP 343−1 Lean can be configured so that the SIMATIC 300 station can be addressed as a PROFINET IO device. Due to the programmability of SIMATIC 300 stations, they are also known as “intelligent” PROFINET IO devices because: Process data can be processed before it is forwarded to the PROFINET IO controller or after it has been received from it and output to the process I/O. In the following sections, the name “PROFINET IO device” also refers to the CP located in the S7 station and configured as a PROFINET IO device. 6.1 Overview of the Preparatory Steps The following steps are necessary to operate the SIMATIC 300 station with the CP as a PROFINET IO device: Configuration Programming Configure the CP as PROFINET IO device for data exchange over PROFINET IO. See Section 6.3 Write the user program for the PROFINET IO device SIMATIC S7 and download it to the SIMATIC S7 CPU. See Section 6.4 Commissioning Commission and test the PROFINET IO controller and PROFINET IO device Communication diagnostics (for example if problems occur during communication) B3L−20 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 6 6.2 Configuring and Programming the CP as a PROFINET IO Device Principle of Data Exchange over PROFINET IO Data Exchange between controller and CP as PROFINET IO device Data exchange between a PROFINET IO controller and PROFINET IO device involves the following procedure: S On the PROFINET IO controller Data exchange is initiated by the PROFINET IO controller that writes output data to the configured output area (O addresses) and fetches input data from the configured input area (I addresses). S On the PROFINET IO device Data is processed by the CP in the PROFINET IO device on the interface to the PROFINET IO controller. Communication within the PROFINET IO device involves calling the FCs PNIO_RECV and PNIO_SEND in the user program of the CPU. PROFINET IO device CPU STEP 7 user program Process outputs PROFINET IO controller CP CP database PROFINET IO data areas (DB, bit memory) PNIO_RECV PNIO_SEND PROFINET IO Receive Send Configured O addresses Configured I addresses Process inputs Figure 6-1 Interaction between PROFINET IO Device and PROFINET IO controller Note In the CPU of the device, the IO data areas for input data and output data are transferred as an entire area to or from one of the data areas (DB, bit memory) including any gaps. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−21 6 Configuring and Programming the CP as a PROFINET IO Device 6.3 Configuration Configuring the CP as a PROFINET IO device involves the two following activities in STEP 7: 1. The CP is inserted in a SIMATIC 300 station in HW Config and enabled for PROFINET IO device mode in the properties dialog. 2. The CP is assigned to a PROFINET IO controller as a PROFINET IO device in HW Config. Notice These two configuration steps can be taken independently in HW Config. In both steps, make sure that the configured device name for the PROFINET IO device matches exactly. 6.3.1 Installing the CP and Specifying it as PROFINET IO Device Follow the steps below in STEP 7 / HW Config: 1. Take the required CP from the hardware catalog and insert the module in the SIMATIC 300 station. Figure 6-2 B3L−22 Inserting the CP in a SIMATIC Station in HW Config CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 6 Configuring and Programming the CP as a PROFINET IO Device 2. Check and, if necessary, correct the IP address in the “Properties Ethernet” dialog. Notice The IP address of the PROFINET IO device and the IP address of the PROFINET IO controller must be located in the same IP subnet. 3. Complete the “Properties Ethernet” dialog with OK. 4. Open the properties dialog of the CP. 5. Assign a unique name to the CP as PROFINET node in the “PROFINET” tab. This name may only be assigned once in the PROFINET IO line. 6. Select the option “Enable PROFINET IO device operation”. Figure 6-3 Setting the Device Name and the PROFINET IO Device Mode 7. Download the configuration data to the SIMATIC 300 station. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−23 6 Configuring and Programming the CP as a PROFINET IO Device 6.3.2 Assigning the PROFINET IO Device to a PROFINET IO Controller PROFINET IO Controller This section describes the configuration of PROFINET IO controllers with STEP 7. This includes: S Stations of the type SIMATIC 300 and SIMATIC 400 − CPU with integrated PROFINET IO controller (for example CPU 317−2 PN/DP). − CPU with external PROFINET IO controller (for example CP 343−1). S SIMATIC PC station − For example with CP 1616 If you do not configure your system with STEP 7, you will need to use the GSDML file of the CP to configure the CP in your configuration system (download address see Section 9.10) When configuring the PROFINET IO device (see Section 6.3.1), the selected PROFINET IO controller is unimportant. Requirements for Configuration in STEP 7 There must be a SIMATIC station in the STEP 7 project in which a module (CPU or CP) supports operation as PROFINET IO controller. Notice The IP address of the PROFINET IO device and the IP address of the PROFINET IO controller must be located in the same IP subnet. Step 1: Configuring the PROFINET IO controller With some PROFINET IO controller types, STEP 7 automatically creates a PROFINET IO system as soon as you insert the module, otherwise you may need to add a PROFINET IO system. Drag the required IO devices from the hardware catalog to this PROFINET IO system. Configure a PROFINET IO controller as follows: 1. Open the hardware configuration of the station you want as PROFINET IO controller in HW Config. 2. If no PROFINET IO system exists, select the PROFINET IO controller (for example CP 343−1 EX30/GX21, CP 443−1 EX41, CPU 317−2 PN/DP) and insert a PROFINET IO system (menu “Insert” "“PROFINET IO System”). B3L−24 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 6 Configuring and Programming the CP as a PROFINET IO Device Result: You will see the connector symbol for the PROFINET IO system beside the PROFINET IO controller. Step 2: Configuring the PROFINET IO device on the PROFINET IO controller 1. Open the hardware catalog and select a version of the CP V2.0 or higher as the PROFINET IO device from the folder “PROFINET IO” "“I/O” "“SIMATIC S7−CP” "“CP 343−1 Lean”. 2. Connect the CP with the PROFINET IO system (drag and drop). 3. Add input and output modules with the required I/O data length (1 to max. 240 bytes) to the PROFINET IO device. The following screenshot shows the configuration table of the PROFINET IO controller with an S7−400 station as PROFINET IO controller. The PROFINET IO device shown here, for example, has three modules for process inputs (I address) and process outputs (O address). Figure 6-4 SIMATIC Station with PROFINET IO System with the CP as Device with Input (DI) and Output Modules (DO) CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−25 6 Configuring and Programming the CP as a PROFINET IO Device Step 3: Configuring the properties of the CP as PROFINET IO device Continue configuration in HW Config as follows: 1. Open the properties dialog of the PROFINET IO device that you inserted in the PROFINET IO system. 2. In the “General” tab, assign the same device name that you selected in Section 6.3.1. Figure 6-5 Properties Dialog of the Device: Assigning the Device Name 3. Deselect the “Assign IP address by IO controller” option. This step is a recommendation! By deactivating this option, the IP address you assigned when you installed the CP in the SIMATIC 300 station (see Section 6.3.1) comes into effect on the PROFINET IO device. Otherwise the IP address you selected there will be overwritten by an IP address assigned by the PROFINET IO controller. If it is overwritten, any configured connections (S7, ISO-on-TCP, TCP) will no longer be established. B3L−26 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 6 Configuring and Programming the CP as a PROFINET IO Device No further parameter assignment of the modules is necessary. Note By selecting suitable network components and setting the network properties (Section 9.2) make sure that in PROFINET IO mode, the PROFINET line can be operated without exception at 100 Mbps full duplex. 6.4 Programming By programming, you specify the sequence of the user program for the CPU and therefore also access to the I/O data. To write and read process data, use the FCs PNIO_SEND (FC11) or PNIO_RECV (FC12) from the SIMATIC NET block library in your user program. How to use the existing functions (FCs) in your user program for PROFINET IO device mode is described in the following sections of this chapter. You will find an example matching the configuration described in the previous chapter in Section 6.5. 6.4.1 Interface for Programming on the PROFINET IO Device FCs Two functions (FCs) are available for data exchange using the STEP 7 user program: S PNIO_SEND (FC11) This FC reads the preprocessed process inputs of the CPU and transfers them to the PROFINET IO controller (configured I addresses). The preprocessed process inputs are available in a DB or bit memory area. S PNIO_RECV (FC12) The block accepts the data transferred by the PROFINET IO controller (configured O addresses) and writes it to the data areas of the CPU reserved for process outputs. You will find the precise syntax of the FCs and the meaning of the block parameters in the chapter on FCs in the general part of the manual or in the online help for the block library in STEP 7. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−27 6 Configuring and Programming the CP as a PROFINET IO Device Data consistency The length information in the block call must be identical to the total length of the input or output data configured for this PROFINET IO device. The entire input or output data area of the PROFINET IO controller is transferred in its entirety between the CP and CPU and is therefore consistent. Note: Remember, however, that in terms of the “IO user data” within a PROFINET IO system, only the data consistency of individual IO slots can be guaranteed. This applies regardless of whether consistent data transfer between the CPU and CP is guaranteed for the blocks described here. 6.4.2 Initialization and Configuration Initialization As a PROFINET IO device, the CP requires the following information in the user program for configuration by the PROFINET IO controller at every startup: S Length of the input data (when FC11 is called) S Length of the output data (when FC12 is called) When the connection is established between the PROFINET IO controller and the PROFINET IO devices of a PROFINET IO line, the entire length of the input and output data is checked. The PROFINET IO controller compares the configured entire length of the input and output data with the LEN parameter of FC11 and FC12 in the user program of the device for every PROFINET IO device. If the length information for the input and output data does not match, the block is terminated with an error. During this initialization phase, the two blocks must be called until FC11 signals DONE=1 and FC12 signals NDR=1. Notice Remember that the successful configuration by the PROFINET IO controller is only possible after local initialization by the FC calls PN IO_SEND (FC11) for the input data and PN IO_RECV (FC12) for the output data. Note During initialization, the data of PNIO_SEND (FC11) is not evaluated and the data of PNIO_RECV (FC12) is initialized with default values. FC11 and FC12 transfer valid data only following the subsequent calls. B3L−28 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 6 Configuring and Programming the CP as a PROFINET IO Device Reasons for reinitialization The PROFINET IO device requests reinitialization by the user program in the following situations: S The length information of the input and output areas in the FCs does not match the information configured for this PROFINET IO device on the PROFINET IO system. A change in the length in the FC calls in the user program counts as a configuration change. S The CPU or CP changes to STOP mode. S The watchdog time was exceeded (see below). S Following a connection abort between the PROFINET IO controller and PROFINET IO device (for example because the PROFINET IO controller was turned off). Watchdog FC11 and FC12 each have their own watchdog. Depending on the average CPU cycle time, the connection to the PROFINET IO controller is terminated if one of the two blocks is no longer called following the initialization phase. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−29 6 Configuring and Programming the CP as a PROFINET IO Device 6.5 Example of Configuration and Programming The configured input/output modules must be accessed in the user program of the PROFINET IO device using FCs. The FCs provide the process data preprocessed in the user program of the PROFINET IO device on the interface to the PROFINET IO controller (PNIO_SEND) or fetch the data provided by the PROFINET IO controller for further processing in the user program of the PROFINET IO device (PNIO_RECV). The following example shows the configuration in HW Config and excerpts of the user program of the CPU. I addresses and O addresses configured on the PROFINET IO controller The schematic shows the CP configured as a PROFINET IO device in the PROFINET IO system with three modules for process inputs and process outputs. PNIO_RECV PNIO_SEND S Input area: Figure 6-6 B3L−30 S Output area: − Length: 20 bytes − Length: 7 bytes − available in DB10 − available in DB11 − transferred with FC11 PNIO_SEND − transferred with FC12 PNIO_RECV Configuration of a PROFINET IO device in HW Config CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 6 Configuring and Programming the CP as a PROFINET IO Device Transfer the process inputs (DB10) to the I addresses with PNIO_SEND For the configured I addresses, you will need to make data areas available on the PROFINET IO device, for example in a DB (in this example in a DB10) that contains not only the process data but also the data areas for the IOCS status information. Figure 6-7 Data Structure for PNIO_SEND in the PROFINET IO Device The call interface PNIO_SEND in the user program STL Explanation call fc 11 //PNIO_SEND block call //(transfer inputs to IO controller) //Module address from hardware configuration //No. of log. I addressesto transfer. in bytes CPLADDR:= LEN := W#16#0100 20 IOCS := P#DB10.DBX20.0 BYTE 3 DONE := M 70.0 ERROR := M 70.1 STATUS := MW 72 CHECK_IOCS := M 70.2 SEND := P#DB10.DBX0.0 BYTE 20 //Per send data byte, one bit status in DB10 //Address for return parameter DONE //Address for return parameter ERROR //Address for return parameter STATUS //Address for return parameter CHECK_IOCS //Data area to be transferred from DB10 //(20 bytes) CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−31 6 Configuring and Programming the CP as a PROFINET IO Device Transfer the O addresses to the process outputs (DB11) with PNIO_RECV For the configured O addresses, you will need to make data areas available on the PROFINET IO device, for example in a DB (in this example in a DB11) that contains not only the process data but also the data areas for the IOPS status information. Figure 6-8 Data Structure for PNIO_RECV in the PROFINET IO Device The call interface PNIO_RECV in the user program STL Explanation call fc 12 //PNIO_RECV block call //(read outputs from IO controller) //Module address from hardware configuration //No. of log. O addresses to transfer in bytes //Per receive data byte one status bit in DB11 //Address for return parameter NDR //Address for return parameter ERROR //Address for return parameter STATUS //Address for return parameter CHECK_IOPS //Received data in DB11 (7 bytes) //Diagnostic information CPLADDR:= W#16#0100 LEN := 7 IOPS := P#DB11.DBX7.0 BYTE 1 NDR := M 74.0 ERROR := M 74.1 STATUS := MW 76 CHECK_IOPS := M74.2 RECV := P#DB11.DBX0.0 BYTE 7 ADD_INFO:= MW 26 B3L−32 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 7 7 Web Diagnostics Web Diagnostics With Web diagnostics, the CP provides you with the option of calling up the most important settings of a connected station and the status of their network connections and communication partners from an HTTP client on a PG/PC. You can also query the diagnostic buffer entries of the modules of the rack in which the CP is located. Using Web diagnostics, you can only read the data of the connected station. 7.1 Requirements and Use Settings for Access to Diagnostic Data Check the following settings that are necessary for access to the diagnostic data: S To load diagnostic data, Java Script must be enabled in the Internet browser. S The browser must support frames. S Cookies must be accepted. S The browser should be set so that it downloads the current data from the server automatically each time it accesses a page. In Internet Explorer, you will find these settings in the “Tools” menu "“Internet Options” "“General” tab "“Temporary Internet Files” group box " “Settings” button. S When using a firewall on your PG/PC, the following port must be enabled for Web diagnostics: “http port 80/TCP” Note Station or device names configured in STEP 7 with special characters (for example umlauts ä, ü etc.) may possibly be incorrectly interpreted in Web diagnostics. Starting and Working with Web Diagnostics Follow the steps outlined below to start Web diagnostics: 1. Connect your PC with the LAN to which the CP is connected. 2. Start the Internet browser and enter the following address in the address line of your Internet browser: http:\<IP address of the CP> Web diagnostics opens with the “Start Page”. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−33 7 Web Diagnostics 3. Select the display language you require from the “Language” drop-down list box at the top right. The following languages are available: S English S Deutsch S Français S Español S Italiano 4. You open the other pages using the navigation panel to the left of the window. 7.2 Diagnostics Pages of the CP Layout of the Diagnostics Pages The title bar of the Web diagnostics page displays the STEP 7 station name of the S7 station in which the CP is located. Below the title bar of the start page, you can see the CP type (here: CP 343−1 CX10). Above the navigation panel to the left, you can see the module type (here: “SIMATIC S7 CP”). B3L−34 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 7 7.2.1 Web Diagnostics Start Page This page displays general device data and the status of the connected CP. Parameter Function General Station name Configured name of the station in which the CP is installed. Module name Configured name of the module Module type Name of the module type Status Operating mode Current mode of the CP: S S S S S Starting RUN (CP in productive mode) Stopping STOP Stopped with error CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−35 7 Web Diagnostics 7.2.2 Identification Here, you can see a variety of information on the CP for identification and maintenance. Parameter Function Identification Plant designation 1) Plant designation of the CP if this was configured. Location identifier 1) Location identifier of the CP if this was configured. Serial number Serial number of the CP Order number Order number of the CP Version Hardware Hardware version of the module Firmware Version of the stored firmware 1) B3L−36 A CP acting as PROFINET IO device can be informed of the plant designation and location identifier by the PROFINET IO controller using the “write data record” function. This is done using the maintenance data record “IM1” with index AFF1H. The “write data record” function is explained in detail in the general part A of the manual in the description of the FCs for PROFINET IO. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 7 7.2.3 Web Diagnostics Rack Configuration The slots of the station and general data along with the status of the devices is displayed here. Parameter Function Rack Configuration (rack name) Slot Slot of the individual modules in the rack Status Status display of the relevant module: S Green (OK, module in operation) S Red (a problem has occurred) S Yellow (module changed to STOP) The last column “LED Status” contains more information. Module name Name of the module configured in HW Config Order number Order number of the module CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−37 7 Web Diagnostics Parameter Function Version Firmware version of the module LED Status LED display of the module: S Gray (inactive LED, the LED is off) S Colored (active LED, the LED is lit) The number of type of the LEDs depends on the particular module type. You will find an explanation of the significance of the LEDs in the documentation for the particular module. B3L−38 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 7 7.2.4 Web Diagnostics Diagnostic Buffer This table lists all the events in the chronological order in which they were received. The latest entry is at the start and the oldest entry at the end of the table. By clicking on the various tabs above the table, you can select the individual modules in the rack. Parameter Function Events Number Consecutive number of the entry Time Time of the entry Note If the module has synchronized itself with a time server, the current time is displayed. Otherwise the time since the last restart is displayed. Date Date of the entry if the module is synchronized. Otherwise the default time of the module (01.01.1994) or the day of the last restart is displayed. Event Displays the diagnostic buffer entry (entries only in English) Details: “no. of the event” Event ID Event ID of the diagnostic buffer entry Text of the event entry CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−39 7 Web Diagnostics 7.2.5 Industrial Ethernet “Parameters” Tab This page shows you the various parameters of the MAC address, the IP address and the LAN attachments. Function Parameter Network attachment MAC address (active) Active MAC address of the CP MAC address (factory setting) MAC address set in the factory Device name Device name configured in STEP 7 (properties dialog, “PROFINET” tab) IP parameters IP address IP address of the CP Subnet mask Configured subnet mask Default router IP address of a configured router IP settings How the IP address is assigned (for example, STEP 7, DHCP ...) Physical properties Port number Number of the LAN port of the CP: 1, 2 Link status Status of the LAN port: S OK S no link Setting Display of the individual network settings configured in STEP 7: S Configured S automatic (automatic setting / autonegotiation) Mode Displays the current network properties (transmission rate and direction). Possible values: S S S S B3L−40 10 Mbps half duplex 10 Mbps full duplex 100 Mbps half duplex 100 Mbps full duplex CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 7 Web Diagnostics “Statistics” Tab This page displays information on sent and received frames since the last module restart. Parameter Function Data packets sent Number of error-free frames sent, number of unicast, multicast and broadcast frames and the frames canceled due to a collision Received data packets Number of error-free received frames, received unicast, multicast and broadcast frames, frames rejected due to checksum or alignment errors and frames rejected due to a lack of resources “TCP Connections” Tab This page informs you about existing TCP connections. Function Parameter Number Consecutive number of the TCP connection Local IP address IP address of the CP Partner IP address Partner IP address Local port Number of the port used for the TCP connection Partner port Number of the port on the partner used for the TCP connection Status Connection status of the TCP connection, for example: S S S S LISTEN (waiting for connection) ESTABLISHED (existing connection) TIME WAIT (wait state prior to connection termination) and other interim statuses such as SYN SENT, SYN RECV, CLOSING etc.) “UDP Connections” Tab This page informs you about existing UDP connections. Parameter Function Number Consecutive number of the UDP connection Local IP address IP address of the CP Partner IP address Partner IP address local port Number of the port used for the UDP connection Partner port Number of the port on the partner used for the UDP connection CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−41 7 Web Diagnostics 7.2.6 PROFINET IO This page provides you with information on the most important parameters of the PROFINET IO configuration. Parameters of a PROFINET IO Device Parameter Function PROFINET IO Configuration Mode PROFINET IO mode of the CP (here: PROFINET IO device): S PROFINET IO controller S PROFINET IO device S No PROFINET IO configuration Device name Device name IP address IP address of the device B3L−42 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 7 Parameter Status Web Diagnostics Function Status of the device: S OK (problem-free operation) S No connection to PROFINET IO controller (connection disrupted or broken down) S PROFINET IO blocks are not called correctly (the blocks are not called or not correctly called) Assigned PNIO controller Device name Device name of the assigned controller IP address IP address of the controller CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−43 8 Compatibility with Predecessor Products 8 Compatibility with Predecessor Products 8.1 Extended Functionality New: Enhanced functions compared with module 6GK7 343−1CX10−0XE0 with firmware version V1.0 The following properties, services and functions are new: 8.2 S Web diagnostics S New GSDML file Replacing Older Modules / Replacing Faulty Modules Use as a Replacement: The CP 343−1 Lean with order number 6GK7 343−1CX10−0XE0 (firmware version 2.0) described here can be used as a replacement for the following predecessor products: S CP 343−1 Lean (6GK7 343−1CX00−0XE0) If you replace a CP 343−1 Lean (CX00) module with a CP 343−1 Lean (CX10) and have STEP 7 version < V5.4, all the previous functions of the module remain available. Any port settings relating to Ethernet are adopted for port 1. The additional second RJ−45 port is also available in the “Automatic setting” mode. S CP 343−1 Lean (6GK7 343−1CX10−0XE0, firmware version 1.0) All previous functions remain available. They are supplemented by the functions of Web diagnostics. Notice For new user programs, please make sure that you always use the latest block versions. You will find information on the latest block version and links to download the current blocks on the Internet: http://www4.ad.siemens.de/WW/news/en/8797900 B3L−44 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 8 Compatibility with Predecessor Products Module Replacement When replacing an older module with the module described here, keep to the steps outlined below: Table 8-1 Configuration Steps Originally configured module 6GK7 343−1CX00−0XE0 Case a: Configuration unchanged If you do not have any new requirements compared with the previous CP (for example, PROFINET IO mode), no modification of the project engineering is necessary. Case b: Adapted project engineering data If you want to use the extended functionality of the new CP, follow the steps below: 1. In STEP 7 / HW Config, replace the previously configured CP Lean with the new module from the hardware catalog. 2. Extend your configuration to match your requirements, for example, by enabling the CP for PROFINET IO device mode. 3. Save, compile and download the configuration data to the CPU again. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−45 9 Further Notes on Operation 9 Further Notes on Operation 9.1 Memory Reset Available Functions The CP has a two-level function available for resetting memory: S Clear / reset Following this memory reset, the CP retains the preset MAC address and the retentive parameters. The CP is therefore immediately ready for downloads using the IP address. The retentive parameters include: − IP address, subnet mask and, if applicable, router address − LAN settings S Resetting to factory settings After this memory reset, the CP retains only the factory-set MAC address (as shipped). Note Using the functions described here to reset the memory, you do not modify the configuration data on the CPU! If you subsequently upload the configuration data from the CPU to a PG you will always obtain the configuration data that were previously on the CP (with parameters, connections, IP address). How to Use the Function You can start the memory reset functions in STEP 7. S Clear / reset In STEP 7 / /HW Config with PLC " Clear/Reset or In STEP 7 / NCM Diagnostics with Operating Mode S Clear/Reset Module " Reset to Factory Factory defaults reset In STEP 7 / NCM Diagnostics with Operating Mode Defaults B3L−46 " CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 9 Further Notes on Operation Behavior after Memory Reset The CPU in the S7 station does not recognize that the CP memory was reset. The CP therefore changes to the “stopped with error” state (see Chapter 4). The configuration data must then be reloaded. You can initiate this loading by turning the power off and on again. 9.2 Working with Fast Ethernet − automatic switchover How Automatic Switchover of the Network Settings Works The CP has two 10/100 Mbps half/full duplex ports with autosensing and autonegotiation of the network settings. After turning on the CP, these functions work as explained below: S The CP attempts to detect the transmission rate (10/100 Mbps) being used by the partner. If no connection is established between partners in PROFINET IO mode, you should check whether the devices involved are set to “automatic setting” or 100 Mbps full duplex. S If detection is possible, the CP attempts to negotiate a full duplex with the partner. S If no negotiation is possible, the CP uses the previously detected transmission rate and half duplex. Duration of the procedure: up to 2 seconds You set the network properties of the CP in STEP 7 in the properties dialog of the CP, “Port Parameters” tab. Autocrossing The automatic setting also includes an “autocrossing” mechanism. With autocrossing, you can connect network components and end devices using either crossover or straight−through cables. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−47 9 Further Notes on Operation Automatic Setting or Individual Network Settings As default, the CP is configured for automatic detection (autosensing). As soon as you define a configuration manually when configuring the CP with STEP 7/HW Config (in the properties dialog of the CP − “Port Parameters” tab), the automatic negotiation of the network settings (autonegotiation) is no longer in effect. If, on the other hand, the communication partner works with autonegotiation, no communication will be established. Only use manual configuration when the communication partner works with the same manually set configuration. Notice When operating with PROFINET IO, a transmission rate of 100 Mbps full duplex is necessary. Further Notes: S Autocrossing If you disable the “automatic setting” option in the “Port Parameters” tab, autocrossing is also disabled; which cable you can then use depends on the role of the CP (network component or end device). S 10/100 Mbps network components without “Autonegotiation” If you use 10/100 Mbps network components that do not support “Autonegotiation”, you may have to set the mode manually during CP configuration using STEP 7 / HW Config (in the properties dialog of the CP). As default, the CP is configured for automatic detection. S Forcing a specific network setting instead of “Autonegotiation” If your application requires a fixed network setting instead of “Autonegotiation”, both partner devices must have the same setting. S No reaction to Autonegotiation query with manual configuration Remember that if you configure the CP manually, it will not react to an autonegotiation query! As a result, a connected partner will not be able to make the required network setting and communication will not be established. Example: If, for example, the CP is set to “100 Mbps − full duplex”, a CP connected as partner will set “100 Mbps − half duplex”. Reason: Due to the fixed setting, no autonegotiation response is possible; the connected partner recognizes the 100 Mbps with autosensing but nevertheless remains in half duplex. B3L−48 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 9 S Further Notes on Operation Recommendation: Change “individual network settings” only over MPI. If you modify the LAN settings in the properties dialog of the CP in the “Port Parameters” tab, these changes will be adopted by the CP and activated when the configuration data is downloaded to the CP. We therefore recommend that you download configuration data to the S7 station over an MPI connection if you change this setting. If you download the configuration data over the LAN interface, depending on the selected setting, it is possible that the current download will not be completed due to the changes to the configuration taking immediate effect. STEP 7 / NCM Diagnostics and Web diagnostics display the network setting You will find information on the network settings currently being used in NCM Diagnostics in the “Industrial Ethernet” diagnostic object in the “Network Attachment” section or in Web diagnostics on the “Industrial Ethernet” page in the “Parameters” tab. 9.3 SNMP Agent SNMP (Simple Network Management Protocol) The CP supports data queries over SNMP in version 1. SNMP is protocol language for managing networks. To transmit data, SNMP uses the connectionless UDP protocol. The information on the properties of SNMP−compliant devices is entered in MIB files (MIB = Managed Information Base). For more detailed information on working with MIB files, refer to the documentation of the SNMP client you are using (example of an SNMP client: SNMP OPC Server from SIMATIC NET). Supported MIB Objects The CP supports all MIB objects according to the MIB standard MIB II (RFC 1213) and LLDP MIB. Exceptions / restrictions: S Write access is permitted only for the following MIB objects: sysContact, sysLocation and sysName; For security reasons, only read access is permitted for all other MIB objects. S Traps are not supported by the CP. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−49 9 Further Notes on Operation Access Permissions using Community Name The CP uses the following community names for assigning permissions: S For read access: “public” S for read and write access: “private” (note the use of lower−case letters!) 9.4 Possible Security Gaps on Standard IT Interfaces / Preventing Illegal Access With various SIMATIC NET components, such as OSMs/ESMs, a wide range of parameter assignment and diagnostic functions (for example, Web servers, network management) are available over open protocols and interfaces. The possibility of unauthorized misuse of these open protocols and interfaces by third parties, for example to manipulate data, cannot be entirely excluded. When using the functions listed above and these open interfaces and protocols (for example, SNMP, HTTP), you should take suitable security measures to prevent unauthorized access to the components and the network particularly from within the WAN/Internet. Notice We expressly point out that automation networks must be isolated from the rest of the company network by suitable gateways (for example using tried and tested firewall systems). We do not accept any liability whatsoever, whatever the legal justification, for damage resulting from non−adherence to this notice. If you have questions on the use of firewall systems and IT security, please contact your local Siemens office or representative. You will find the address in the SIMATIC catalog IK PI or on the Internet at http://www.automation.siemens.com/net > Contact & Partners > Local Partners. 9.5 Influence of MPI on Connections via Industrial Ethernet If a station on MPI is added or removed, for example because a service PG has been connected or disconnected, it is possible that active communication connections on the communications bus are aborted. This has the following effects on the communication connections on Industrial Ethernet: S B3L−50 All S7 connections are temporarily aborted. This does not apply when using CPUs with a separate K bus (for example, the CPU 318−2, CPU 317−2 PN/DP, CPU 319−3 PN/DP). CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 9 Further Notes on Operation S The connections on which a job on the communication bus with a data length > 240 bytes is being processed are aborted temporarily. S FETCH/WRITE connections are temporarily aborted. On the FC interface in the user program, the condition codes made up of the DONE, ERROR and STATUS parameters must be evaluated in FC11 / FC12. 9.6 Special Features of IP Configuration Configured S7 connections cannot be operated if the IP address is assigned over DHCP Notice If you obtain the IP address over DHCP, any S7 connections you may have configured will not work. Reason: The configured IP address is replaced by the address obtained over DHCP during operation. 9.7 Reserved Port Numbers The following local port numbers are reserved; You should not use these for other purposes in the connection configuration. Table 9-1 Reserved Port Numbers Protocol Port number TCP 20, 21 TCP 25 SMTP TCP 80 HTTP TCP 102 RFC1006 TCP 135 RPC−DCOM UDP 161 SNMP_REQUEST UDP 34964 PN IO UDP 65532 NTP UDP 65533 NTP UDP 65534 NTP UDP 65535 NTP CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 Service FTP B3L−51 9 Further Notes on Operation 9.8 Restart after Detection of a Duplicate IP Address in the Network To save you time-consuming troubleshooting in the network, the CP detects double addressing in the network. When you eliminate the cause by removing the device with the same IP address or changing its address, you must then restart the CP. 9.9 Obtaining the IP Address over DHCP − CP STOP on Expiry of the Lease If you have configured “Obtain IP address from a DHCP server”, when the CP starts up, it is assigned a valid IP address by the DHCP server for a restricted time (period of the lease). When the lease expires the reaction of the CP is as follows: The CP changes to STOP and loses the previously assigned IP address if the DHCP server does not assign a new IP address on expiry of the lease. All communication connections are terminated. 9.10 Other information available about the CP FAQ You will find detailed information (FAQs) on using the CP described here on the Internet under the following entry number: http://www4.ad.siemens.de/WW/news/en/10806025> “FAQ” tab GSDML file You will find the GSDML file for the CP described here on the Internet under the following entry ID: http://support.automation.siemens.com/WW/view/en/19698639/133100 B3L−52 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 10 How to Load New Firmware 10 How to Load New Firmware Requirements You download new firmware to a SIMATIC NET CP using the firmware loader shipped with STEP 7 / NCM S7. Requirements for Downloading S To download firmware, you require an Industrial Ethernet CP module in the PG/PC (for example, CP 1613) or a normal Ethernet module with the “Softnet” software package. S The S7-ONLINE interface must be set to the “ISO − Industrial Ethernet” protocol. It is not possible to download using TCP/IP (and therefore not to other networks). How to Download New Firmware You always start the download using the active MAC address of the CP! LEDs to Indicate the CP Mode The different combinations of the LEDs on the front panel indicate the status: Table 10-1 SF (red) BF (red) RUN (green) STOP (yellow) CP Operating Mode Downloading firmware. Firmware was successfully downloaded. Firmware could not be downloaded. Legend: (colored) on off (colored) flashing “−” any What to do if a Download is Interrupted Disturbances or collisions on the network can lead to packets being lost. In such cases, this can lead to an interruption of the firmware download. The firmware loader then signals a timeout or negative response from the module being loaded. In this case, turn the station off and on again and repeat the download. CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−53 11 Technical Specifications 11 Technical Specifications Transmission rate 10 Mbps and 100 Mbps Interfaces Connection to Ethernet Power supply 2 x RJ−45 jack DC +24 V (permitted range: +20.4 V through +28.8 V) Current consumption S from backplane bus S from external 24 V DC 200 mA maximum TP: approx. 0.2 A maximum Power loss approx. 5.8 W Permitted ambient conditions S Operating temperature S Transportation/storage 0 °C to +60 °C −40 °C to +70 °C temperature 95% at +25 °C S Relative humidity max. S Altitude up to 2000 m above sea level Design S Module format S Dimensions (W x H x D) in mm S Weight approx. Compact module S7-300; single width 40 x 125 x 120 220 g Table 11-1 Description of the Approvals c−UL−us UL 508 CSA C22.2 No. 142 c−UL−us for hazardous locations UL 1604, UL 2279PT.15 CL. 1, Div. 2 GP.A.B.C.D T.. CL. 1, Zone 2, GP. IIC, T.. CL. 1, Zone 2, AEx nC IIC T.. FM FM 3611 CL. 1, Div. 2 GP.A.B.C.D T.. CL. 1, Zone 2, GP.IIC. T.. Ta:.. C−TICK AS/NZS 2064 (Class A). CE EN 61000−6−2, EN 61000−6−4 (replaces EN 50081−2) ATEX Zone 2 EN60079−15 II 3 G EEx nA II T.. KEMA 03 ATEX 1228 X Temperature code “T..” and maximum ambient temperature “Ta:..” as listed on the type plate B3L−54 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 11 Technical Specifications Notice The approvals printed on the purchased device apply. In addition to this, all the information in the S7−300 reference manual “Module Data” /1/ in the chapter “General Technical Specifications” applies to the CP. S Electromagnetic compatibility S Transportation and storage conditions S Mechanical and climatic ambient conditions S Insulation tests, class of protection and degree of protection CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04 B3L−55 11 Technical Specifications B3L−56 CP 343-1 Lean for Industrial Ethernet / Manual Part B3L Release 03/2007 C79000-G8976-C198-04